Living Report · Electrical Planning Report
At its busiest hour of the year, this building draws just 43.0 kW.
That leaves about 80 percent of the main electrical service unused. Pacific on Veterans is already fully electric — heating, hot water, ranges and dryers — so that spare capacity is genuinely available for new loads like EV charging, not spoken for by a future gas conversion.
01 · Capacity, measured
How much electrical room is left.
Capacity is assessed at the strata's own main disconnect using a full year of BC Hydro meter data — the building's genuine busiest hour, plus the 25% safety factor Technical Safety BC requires.
02 · Where the power flows
From the street to your suite, in one diagram.
Tap any box to see what it is, what it powers, and where the spare capacity sits.
03 · What draws power today
Everything already runs on electricity — and it all fits easily.
There is no natural gas service at this property. Every one of these loads already sits inside the measured peak, so nothing is waiting to be converted.
04 · The future, scenario by scenario
What could be added — and does it fit?
Select a scenario to see the report's estimated load and its verdict. Every answer comes straight from the report.
EV charging at every unit plus a full heat pump retrofit together add 54.6 kW — and the service still holds 118.5 kW spare, 54.8 percent of capacity. Pacific on Veterans can do all of it without any upgrade to the electrical service or the building distribution equipment.
05 · Equipment health
Installed in 2012, and in good condition throughout.
The main disconnect, meter centre, house panel and suite panels are all Siemens equipment installed with the building — observed with no rust, water staining, damage or signs of overheating. No upgrades or modifications to increase capacity are required or recommended.
06 · Our recommendations
What to do, in plain order.
07 · Methodology & the fine print